Kinshasa, a megacity of traffic jams, potholes, transit chaos

Kinshasa, a megacity of traffic jams, potholes, transit chaos

Kinshasa, a megacity of traffic jams, potholes, transit chaos …C0NTINUE READING HERE >>>

Kinshasa has 17 million inhabitants but no real system.
: Hardy_Bope / AFP
Source: AFP

Cable , urban rail link or ring road — Kinshasa has big plans for alleviating its traffic chaos but for now, travelling into the megacity remains a daily headache for millions of people.

Viviane Yuka leaves for work at 5:00 am every day to battle through the Congolese capital's clogged-up streets where motorbikes, packed buses and taxis compete for space.

The city has 17 million inhabitants across 24 communes but still has no real public transport system and nearly all the passenger vehicles on its roads are privately owned.

“We suffer so much to find transport, we often go long distances on foot,” Yuka, who sells brushes and brooms at one of Kinshasa's sprawling markets, told AFP.

Once aboard one of the yellow minibuses — a mode of transport ominously known locally as the “Spirit of Death” — endure the “suffocation” of being crammed in like sardines, the said.

Read also

Vote-ready waits to scoop up Brexit boost

Passengers say they never know how much they will be charged as fares are not standardisedPassengers say they never know how much they will be charged as fares are not standardised.
Photo: Hardy_Bope / AFP
Source: AFP

PAY ATTENTION: Share your outstanding with our editors! Please reach us through [email protected]!

She never knows exactly how much she will be charged.

A lack of standardised fares means she can pay anything from 4,000 to 8,000 Congolese francs, about $1.5 to $3.

“The state must take responsibility by determining the price of each journey, as was the case in the past,” ticket seller Maitre Brice said.

On many roads, including some considered main thoroughfares, deep potholes or pools of dirty stagnant water are not uncommon.

People struggle to get into Kinshasa for work because of the chaos on its roads and lack of public transportPeople struggle to get into Kinshasa for work because of the chaos on its roads and lack of public transport.
Photo: Hardy_Bope / AFP
Source: AFP

After a river burst its banks some months ago, part of a road near the of Kinshasa in the west of the city is still submerged.

Motorbike taxi driver Leon Kumba Hamba, who takes the road every day, ponders whether the authorities have ever dared driving on it themselves.

It's so bad, he now charges customers between 3,000 and 5,000 Congolese francs to cross the submerged street to the university, instead of the usual rate of 1,000 francs.

Read also

Short fuses in Egypt as blackouts stretch into sweltering summer

“We suffer so much… it's so annoying,” the 31-year-old grumbled, his and trousers soaked from the water.

‘Nothing has been done'

Infrastructure projects to tackle the problems have been launched but most have barely got started.

Infrastructure projects have been launched to tackle the traffic woes including a cable car, rail link and ring roadInfrastructure projects have been launched to tackle the traffic woes including a cable car, rail link and ring road.
Photo: Hardy_Bope / AFP
Source: AFP

All the while, Kinshasa continues to expand as its population grows.

The envisaged cable car would link up densely populated neighbourhoods in the southern Mont-Ngafula district and ease mobility.

But Robert Ndaka said that since the project was first talked about in the middle of last year “we have heard nothing, nothing has been done”.

“We do not know if it is real or not,” the geological engineer said.

The cable car could provide a “small solution” to the city's traffic woes, Ndaka added — but there is still one problem with the idea.

Most passenger vehicles on Kinshasa's roads are privately ownedMost passenger vehicles on Kinshasa's roads are privately owned.
Photo: Hardy_Bope / AFP
Source: AFP

Kinshasa suffers regular power cuts.

“We don't know how we will be able to use it, it's better to use dirt roads,” Ndaka said.

Read also

Aid groups press to stop Sudan ‘-made' famine as 755,000 projected to starve

Last month, President Felix Tshisekedi launched another project, a planned 63-kilometre (nearly 40-mile) ring road, due to start in the Mitendi area of Mont-Ngafula.

It will be a “high-speed asphalt ring road… with two lanes in both directions”, according to the presidency.

Construction is estimated to last three years, at a cost of $300 million.

An urban train link, called Metrokin, is also in the pipeline.

Last month, President Felix Tshisekedi launched a project for the construction of a 63-kilometre (nearly 40-mile) ring roadLast month, President Felix Tshisekedi launched a project for the construction of a 63-kilometre (nearly 40-mile) ring road.
Photo: Hardy_Bope / AFP
Source: AFP

French company Alstom confirmed to AFP that it has signed an initial partnership agreement with the Congolese state to carry out the work.

It is set to begin with the renovation of a 25-km stretch of railway line from Kinshasa central station in the north of the city, to Ndjili international airport on the eastern outskirts.

But for now, the thousands of passengers desperate to get into the city need to be up before dawn ready to scramble onto an antiquated train.

Source: AFP

>

Be the first to comment

Leave a Reply

Your email address will not be published.


*